• Menemen-Aliağa-Çandarlı Motorway Project “Neonteikhos” Salvage Excavations
  • Ankara-Niğde Motorway Project Archaeological Test Pits and Salvage Excavations
  • Nemport Port Archaeological Impact Assessment Studies
  • Tayakadın Wind Power Plant Project Cultural Heritage Impact Assessment Studies
  • Kıyıköy WPP Project Cultural Heritage Impact Assessment Studies
  • Batı Antalya Airport Cultural Heritage Impact Assessment Studies
  • Archaeological services of TurkStream Natural Gas Pipeline Project
  • Cultural Heritage Impact Assessment Studies in Diyarbakır Fortress and Hevsel Gardens Cultural Landscape
  • Cultural Heritage Impact Assessment Studies in Kanal İstanbul Project
  • Cultural Heritage Management Plan of Tuz Gölü Natural Gas Storage Expansion Project
  • Measured Drawings  and 3D Modeling  of  Reşitköy Dam Ancient Quarry Registered 1st Degree Archaeological Site
  • Archaeo-Geophysical Survey of Parking Area Project of Silifke Municipality
  • Geo-radar Study and Archaeological Assessment Reporting of Layout 46, Block 236, Parcel 23 in Istanbul Province,  Fatih District
  • Archaeological and Cultural Heritage Impact Assessment  Studies in  Ankara-Niğde Motorway Project
  • Cultural Heritage Survey of Mersinli Wind Power Plant Project.
  • Micro-regioning study for 2nd and 3rd Degree Archaeological Protection Sites in Balıkesir Province .
  • 1915 Çanakkale Bridge and Kınalı-Tekirdağ-Çanakkale-Savaştepe Motorway Project (Under Environmental and Social Impact Assessment Studies).
  • Archaeological Test Pit and Salvage Excavations of TANAP Natural Gas Pipeline Project (Lot 1, Lot 2, Lot 3 and Lot 4)
  • Archaeological Survey of North Marmara Motorway Project (Under Environmental and Social Impact Assessment Studies).
  • Measured Drawings and Cleaning Projects Preparation of Ünye Castle.
  • Archaeological Test Pit and Salvage Excavations for Gebze-Orhangazi-Izmir Motorway Project.
  • Archaeological Survey of Turkstream Natural Gas Pipeline Project (Under Environmental and Social Impact Assessment Studies)
  • Archaeological Survey of Ağan Thermal Power Plant Project (Under Project Design Studies).
  • Archaeological Survey, Test Pit and Salvage Excavation of Karaburun-2 Thermal Power Plant Project (Under Project Design Studies).
  • Archaeological Survey of Kızılcaterzi Wind Power Plant Project (Under Project Design Studies).
  • Archaeological Survey of Afyon-Seçköy Natural Gas Pipeline Project (Under Project Design Studies).
  • Dhı Qar and Samawa 750 Mw Combined Power Conversation Plant (Iraq) (Under Environmental and Social Impact Studies).
  • Archaeology Pool Project.
  • Archaeological Survey of TANAP Natural Gas Pipeline Route (Under Environmental and Social Impact Studies).
  • Archaeological Survey of Iran-Turkey-Europe Natural Gas Pipeline Route (Under Environmental and Social Impact Assessment Studies).
  • Archaeological Survey of Nabucco Natural Gas Pipeline Route (Under Environmental and Social Impact Assessment Studies).
  • Archaeological Test Pit and Salvage Excavations for Gebze-Orhangazi-Izmir Motorway Project.
  • Tangible and Intangible Cultural Heritage Survey for Gebze-Orhangazi-Izmir Motorway Project.
  • Archaeological Survey of North Marmara Motorway (including third bridge over Bosporus) Project (Under Environmental and Social Impact Assessment Studies).
  • Archaeological Survey for Bursa Gaz Natural Gas Pipeline Project (Under Project Design Studies).
  • Archaeological Survey for Karaman – Mersin Natural Gas Pipeline Project (Under Project Design Studies).
  • Archaeological Survey of Yenipazar Mining Area (Under Environmental and Social Impact Assessment Studies).
  • Archaeological Survey of Integrated Health Campus Projects at İzmir Bayraklı and Kocaeli (Under Environmental and Social Impact Assessment Studies).
  • Tangible and Intangible Cultural Heritage Survey for Gökırmak Mining Project (Under Environmental and Social Impact Assessment Studies).
  • Tangible and Intangible Cultural Heritage Survey for Aşağı Kaleköy Hydroelectric Power Plant Project (Under Environmental and Social Impact Assessment Studies)
  • Archaeological Test Pit and Salvage Excavation in Çanakkale Karabiga Thermal Power Plant Project.
  • Preparation of Cutural Heritage Management Plan of the Muş Alparslan II Dam Project.
  • Archaeological Monitoring Services for Manisa Ahmetli Heavy Mineral Sand Project.
  • Archaeological Monitoring Services for Zafer Regional Airport Construction Project.
  • Archaeological Survey and Monitoring Service for Re-Route Area (KP 383) of Baku-Tbilisi-Ceyhan Oil Pipeline Project.
  • Archaeological Survey of Filyos Harbour Project (Under Project Design Studies).
  • Archaeological Survey of Yumurtalık Free Trade Zone Construction Project (Under Project Design Studies).